Yonkers Concrete Co. Call (914) 543-8776
A new concrete curb ramp with a yellow detectable-warning pad leading from a parking lot to the sidewalk in front of a brick storefront

Yonkers Concrete Co.

(914) 543-8776

Free quotes for commercial concrete in Yonkers, NY.

Commercial Concrete in Yonkers, NY

Commercial concrete in Yonkers covers the walks, ramps, parking areas and pads that serve stores, offices and apartment buildings, and three sets of rules shape each job: the 2010 ADA Standards for surfaces people walk or roll on, OSHA's silica standard for cutting and breaking concrete, and the Code of the City of Yonkers for the sidewalk, curb and street and for the hours equipment may run. The U.S. Access Board's guide to the 2010 ADA Standards caps a ramp's running slope, its rise along the direction of travel, at 1:12 and its cross slope, the tilt across it, at 1:48. OSHA's construction rule, 29 CFR 1926.1153, limits a worker's exposure to respirable crystalline silica to 50 micrograms per cubic meter averaged over 8 hours. Repairing or replacing a public sidewalk needs a City Engineering Department permit first.

Published price

$4 to $7 per square foot for concrete parking lots, national (HomeAdvisor, updated Jun 20, 2026) · full pricing guide

Commercial prices are few; each one here is national, not a Yonkers figure, and none is ours. HomeAdvisor's parking lot guide, updated Jun 20, 2026, puts concrete lots at $4 to $7 a square foot with materials and labor. HomeGuide's wheelchair ramp guide, dated November 6, 2024, gives $200 to $250 per linear foot installed for a concrete ramp, with no separate commercial or ADA price. HomeAdvisor's walkway guide, also updated Jun 20, 2026, gives $8 to $12 per square foot with standard finishes. One local cost is public: section 56-18A(2) of the City code (section 56-18 last amended 6-25-2025) charges a $250 filing fee plus $15 per $1,000 of estimated cost on permits other than one- and two-family homes, under $10 million. Our Yonkers concrete cost page lists every service's ranges.

NRMCA's CIP 44 summarizes ACI 318's freeze-thaw classes, where F3 means frequent moisture, freezing and deicing chemicals; its table gives plain F3 concrete a maximum water-cementitious ratio (w/cm, water to binder by weight) of 0.45 and a 4,500 psi minimum, and reinforced F3 concrete a 0.40 maximum and a 5000 psi minimum. NRMCA's CIP 6 keeps control joints, grooves cut so a slab cracks along a straight line, within 24 to 36 times the slab thickness and 15 feet; the sheet also wants metal dowels in slabs that carry heavy loads. Section 43-134C of the City's zoning code wants parking areas paved with an impervious surface (the approving agency can require otherwise for drainage), drained of all surface water and no steeper than 8% at the spaces or as the Traffic Engineer requires. We set the base, slope each surface so water runs away from the building, and cut joints at NRMCA's spacing.

City permits split at the property line. On the lot, the Department of Housing and Buildings issues the permit section 56-15A requires before any structure is built, altered or improved, and the City's FAQ says a new parking area needs that permit plus an Engineering permit for any curb cut, the lowered curb a car drives over, and other work in the right-of-way, the public land along the street. Off the lot, the City's Permits page puts an Engineering permit ahead of any sidewalk repair or replacement, section 103-14 bars cutting a curb without the City Engineer's permit, and section 103-26 adds a street-opening permit and an excavation license from the Office of Consumer Protection. Section 103-36A sets public liability cover of at least $1,000,000 and property damage cover of at least $100,000, and section 103-36B a $50,000 bond for street openings. Our Yonkers permit and sidewalk-rule guide explains each one.

Section 91-34A of the City code requires the sidewalk, flagging and curbstone in front of a building to be kept free from obstruction, and while we work, the walk and the street stay open to the public as City rules require. UDig NY, the State's one-call center, gets our 811 call two to ten working days before any digging, under 16 NYCRR section 753-3.1; show us any private lines, since utilities do not always mark them. In cold weather we protect fresh concrete with the insulated blankets, tarps or enclosures NRMCA's CIP 27 lists; our Yonkers weather and freeze data shows which months that means. Old concrete we break out leaves with us.

For a written quote, send a survey or site plan, photos of the area and street frontage, rough dimensions, the parking space count and any City notice with its date, and say whether the work touches the public sidewalk, a curb or the street and when the property must stay open. The quote is free; it names the permits, says what the price covers and whether sales tax is charged, since Publication 862 counts installing or completely repaving a parking lot as a capital improvement and replacing sections of one as a taxable repair. Notices and curb work have their own pages: repairing a Yonkers sidewalk and driveway aprons and curb cuts.

Free quote

Fields marked * are required.

The quote is free and in writing, and the price is agreed before any work starts.

Signs a commercial walk, ramp or parking area needs work

Commercial concrete problems tend to surface as a measurement or a notice, and each condition below ties to a published value or a City rule. A tape measure, a level and the date on any City letter are enough to check them.

  • A notice under Code section 103-3 to make the abutting sidewalk safe, which gives the owner 30 days from service before the Commissioner of Public Works may step in.
  • A ramp steeper than 1:12, or one rising more than 6 inches without handrails on both sides, measured against sections 405.2 and 405.8 of the 2010 ADA Standards.
  • A lip between walkway slabs taller than 1/4 inch, the most the 2010 ADA Standards accept as a vertical edge before beveling or a ramp is required.
  • Water standing in a parking area after rain, though section 43-134C(2) of the City code requires parking areas to be drained of all surface water.
  • An accessible parking space or access aisle sloping more than 1:48, the limit set by section 502.4 of the 2010 ADA Standards.
  • A new or relocated entrance that needs a curb cut, which section 103-16A caps at 30 feet along the street, at least 10 feet from another cut and not at a corner.

The Access Board's guide says detectable warnings, the truncated-dome surfaces, are required at transit facilities under the Department of Transportation's standards but not at non-transit facilities under the Department of Justice's. The Board's right-of-way guidelines became a final rule on August 8, 2023, and its page shows adoption by DOT for transit stops and by GSA, not by DOJ.

Ramp, landing, handrail and curb-ramp values in the 2010 ADA Standards

The U.S. Access Board's guide to ramps and curb ramps prints the 2010 ADA Standards values for ramps. A run may be no steeper than 1:12 (section 405.2), with a cross slope no more than 1:48 (section 405.3), a rise of no more than 30 inches (section 405.6) and a clear width of at least 36 inches (section 405.5). Top and bottom landings must be at least 60 inches long, and an intermediate landing at least 60 inches wide and 60 inches long (section 405.7).

A ramp rising more than 6 inches gets handrails on both sides (section 405.8), mounted 34 to 38 inches high (section 505), and a curb used as edge protection must stand at least 4 inches tall, or a barrier must stop a 4-inch sphere (section 405.9). Curb ramps, which carry a walk down to street level, follow section 406: a running slope of 1:12 at most, flared sides no steeper than 1:10, a counter slope of 1:20 at most, and a top landing at least 36 inches deep at a built-up curb ramp. The walks that reach them are accessible routes under section 403: a running slope of 1:20 and a cross slope of 1:48 at most, a clear width of 36 inches or more, a passing space every 200 feet, and a vertical edge of no more than 1/4 inch, with changes up to 1/2 inch beveled. These are the guide's values, not legal advice.

OSHA's silica table for saws, drills and jackhammers

Sawing, drilling and breaking concrete puts respirable crystalline silica in the air, and OSHA's construction standard, 29 CFR 1926.1153, caps a worker's exposure at 50 micrograms per cubic meter as an 8-hour time-weighted average, with an action level of 25. Its Table 1 lists the dust controls and respirator protection, as an assigned protection factor (APF), for each tool and shift length. A handheld power saw of any blade diameter needs an integrated water system continuously feeding the blade; outdoors it needs no respirator for 4 hours or less and APF 10 beyond that, and indoors or in an enclosed area APF 10 for any shift. Walk-behind saws need none outdoors and APF 10 indoors.

Jackhammers and handheld chipping tools need a continuous stream or spray of water at the point of impact, with no respirator outdoors for up to 4 hours and APF 10 past that. Handheld and stand-mounted drills need a shroud with dust collection and a HEPA-filtered vacuum for the holes, and then no respirator. The split matters at a storefront or lobby, where the same saw cut that needs no respirator outside on a short shift calls for APF 10 indoors.

Street openings and restoration under Chapter 103 of the City code

Chapter 103 of the City code sets how a street or sidewalk opening is closed again. Backfill goes in layers no more than one foot thick after compaction, each tamped across its full width (sections 103-29B and 103-29D). A trench gets a two-inch temporary bituminous pavement, and section 103-32 bars restoring permanent pavement between December 1 and April 1. Where an opening is too small for a roller, section 103-33D calls for at least six inches of portland cement concrete reinforced with No. 6 gauge wire mesh under two inches of asphaltic wearing course.

Section 103-33G, added in 2023, makes a permittee whose excavation runs past 25 feet resurface the street curb to curb, and section 103-33H requires the whole block's roadway to be resurfaced when patches disturb more than 10% of it. Walks and curbs damaged by the work go back in as good condition as they were found (section 103-31A). The deposit returns only after the permanent pavement or sidewalk is restored, not within three months of completion, and if that falls within December to March the refund period runs to April (section 103-35). An emergency opening still needs a permit application within 24 hours (section 103-37).

Three choices that set a commercial job's cost and schedule

Before work starts, most owners settle three things: the surface of the parking area, whether the route to the door is a sloped walk or a ramp, and when the crew may run equipment. Each rests on a published figure or a written rule.

Concrete or asphalt for parking

In HomeAdvisor's national parking lot figures (Jun 20, 2026), asphalt runs $2 to $4.50 per square foot and concrete $4 to $7. The American Cement Association gives concrete pavements, parking lots among them, an average service life of 30 to 50 years and calls concrete pavement less susceptible to heavy-vehicle wheel ruts. Concrete suits owners who weigh service life above first cost.

Sloped walk or ramp

Under the 2010 ADA Standards a walking surface with a running slope of 1:20 or less is a walk, and anything steeper, up to 1:12, is a ramp. A ramp brings landings at the top and bottom, a cap on rise per run, a minimum clear width, and handrails on both sides once it climbs more than 6 inches. A sloped walk suits a site with room to stretch the climb.

Weekday hours or a noise variance

Section 66-4F of the City code restricts running construction tools and equipment after 6:00 p.m. and before 8:00 a.m., and at any hour on weekends and legal holidays; section 66-2 runs the weekend from 6:00 p.m. Friday to 7:00 a.m. Monday. A business that cannot close on weekdays can seek a variance from the Commissioner of Housing and Buildings under section 66-10A, at $500 per week for properties other than one- and two-family homes under section 66-11A, filed at least 4 business days ahead, the City's application form says.

Section 208.2 of the 2010 ADA Standards sets accessible parking by lot size: one space for 1 to 25, two for 26 to 50, three for 51 to 75 and four for 76 to 100, with one van-accessible space for every six accessible spaces or fraction of six. Each space is marked at least 96 inches wide, beside an access aisle at least 60 inches wide.

Questions

Commercial Concrete FAQs

How much does concrete cost per square foot?

National guides start near $4 per square foot installed: $4 to $7 for concrete parking lots in HomeAdvisor's guide (Jun 20, 2026), $4 to $8 for a new slab in Angi's (Apr 16, 2026), and $5 to $10 for a typical 6-inch slab in HomeGuide's ready-mix guide (January 6, 2026). HomeAdvisor's removal guide (Jun 20, 2026) adds $7 to $14 per square foot in the Northeast to break out an old surface. All are survey numbers, not Yonkers prices and not quotes from us.

Who has to fix the sidewalk in front of a business in Yonkers?

In Yonkers it is the property owner. Section 103-1 of the City code makes the owner of any lot responsible for keeping the sidewalk in front in good repair and safe for public use, and section 103-2 gives owners of multiple-residence developments the same duty for walks on and about them. If a notice goes unanswered, section 103-4 has the Commissioner of Public Works make the repair, and section 103-5 bills the owner.

Can you pour concrete in the winter?

Yes, with protection, and not on a frozen subgrade, which NRMCA's CIP 4 rules out. NRMCA's CIP 27 defines cold weather partly by a daily average under 40 degrees F for more than 3 consecutive days, warns that freshly placed concrete freezes once its own temperature drops under roughly 25 degrees F, and wants it shielded until it gains 500 psi, which takes about two days. The same sheet sets a 55 degrees F minimum placing temperature for sections under 12 inches thick.

Do I need a permit for a dumpster in Yonkers?

From the Engineering Department, only if it sits in the roadway or over the sidewalk. The City's Permits page says an improvement that uses a dumpster or canister there needs an Engineering Department permit, and the Engineering page says no Engineering permit is needed when the container sits completely on private property. The City's undated Engineering fee worksheet, posted as its 2012 permit fees, prints a $250 deposit for a refuse container on the street, then $20 a day, $100 a week or $350 a month.

Free Commercial Concrete Quote — Yonkers

Free quote

Fields marked * are required.

The quote is free and in writing, and the price is agreed before any work starts.